How Much Should You Budget for a Renovation? A Line-by-Line Breakdown and Worksheet

Most renovation budgets start with one number: the contractor’s quote. The trouble is that the quote only covers part of what a renovation costs. Design fees, permits, the weeks you spend eating takeout and the contingency for whatever is hiding behind the drywall all sit outside it.

This guide puts real numbers on the page. You’ll see what common projects cost nationally right now, where the money in a renovation budget goes, how much contingency to hold, and a line-by-line worksheet you can fill in for your own project before you talk to a contractor.

If you’re looking for the planning process itself, start with our five steps for setting a realistic renovation budget. This post is the numbers side. You’ll find more in our Renovation Budgets guides.

What renovations cost right now

The most widely used national benchmark is Remodeling magazine’s Cost vs. Value report, which prices a defined professional project in markets across the country. Here are the 2025 national averages for some of the projects we see most:

Project2025 national average
Minor kitchen remodel (midrange)$28,458
Major kitchen remodel (midrange)$82,793
Major kitchen remodel (upscale)$164,104
Bath remodel (midrange)$26,138
Bath remodel (upscale)$81,612
Bathroom addition (midrange)$60,645
Primary suite addition (midrange)$170,517
Accessory dwelling unit$166,406

Source: Remodeling 2025 Cost vs. Value report, national averages.

Real spending often looks lower. The 2026 Houzz & Home Study found that the median major kitchen remodel cost $55,000 for large kitchens (200 square feet or more) and $35,000 for smaller ones in 2025. For a major primary bathroom remodel, the medians were $30,000 for large bathrooms and $18,000 for smaller ones.

Why the gap? Cost vs. Value prices a full professional project with a set list of features. Houzz reports what homeowners said they spent, so its numbers can include smaller scopes and work homeowners did themselves. Both are national figures, and costs in your area can run higher or lower.

To get closer to home, the Cost vs. Value report also publishes figures by region and for individual metro areas, so you can see how your market compares with the national average. Treat these numbers as a sanity check on the figure in your head, not a target, then let real bids from contractors in your area set your budget.

Where the money goes

Every renovation budget breaks into the same few buckets. Block Renovation gives these typical shares of a planned project cost:

CategoryTypical shareWhat’s in it
Labor30% to 40%Demolition, framing, plumbing, electrical, tile and finish carpentry
Materials, fixtures and appliances40% to 50%Cabinets (often the biggest kitchen line), counters, fixtures, flooring and appliances
Design, permits and fees5% to 15%Designer or architect fees, structural engineering and permit costs
Delivery, disposal and living costs3% to 5%Dumpsters, delivery, sales tax, a temporary kitchen and storage

Block is clear that these aren’t fixed allocations to add up like a formula, and I’d say the same. A kitchen with custom cabinets leans hard toward materials. An older home with surprises behind the walls leans toward labor.

The two rows homeowners miss most are the last two. Design and permit fees often come before any contractor is hired, so they never appear on a quote. Living costs don’t appear anywhere at all until you’re paying them: takeout while the kitchen is gutted, storage for furniture, a few nights in a hotel during the messiest phase. We break down more of these in what a renovation quote doesn’t include.

Contingency: how much to hold and how to protect it

Here’s our rule: hold 15% of your total project cost as contingency. Make it 20% for an older home, or for any project that opens up walls, floors or plumbing. Those are the places where the surprises live. Once walls, floors or plumbing are open, you see what’s been hiding: old wiring, water damage or framing that doesn’t meet today’s code. Those fixes aren’t optional, and they’re the reason older homes need the bigger cushion.

For context, Angi and Block Renovation both recommend setting aside 10% to 20%. Our rule sits inside that range, at the level we’ve seen hold up on real projects.

Two habits keep a contingency doing its job:

  • Use it for true unknowns, not missing scope. Rotted subfloor nobody could see is a contingency cost. Work that should have been in the original bid is a change order conversation. Here’s how to tell the difference and when to say no.
  • Keep it separate from your progress payments. Your contractor’s payments should follow a draw schedule tied to finished work. Contingency sits apart from that, so you can see what’s been used and why.

Our five-step budgeting guide goes deeper on protecting your contingency once work starts.

Planning a renovation or new build? Get an expert set of eyes on your contract and budget before you sign.

The renovation budget worksheet

This is the part to print or copy. Work through each block, fill in a number for every line that applies to your project, and leave nothing blank without a reason. A line with a zero is a decision. A blank line is a surprise waiting to happen.

BlockLineWhat goes here
1. ConstructionDemolition and site prepFrom your contractor’s bid
Framing and structuralInclude engineering-driven changes
Plumbing, electrical and HVACRough-in and finish work
Insulation and drywallIncluding patching after trade work
Finish carpentry, paint, flooring and tileLabor for each finish
2. Materials and selectionsCabinets, countertops and fixturesUse the allowance amounts from your bid, then your real selections
Appliances, lighting and hardwareNote anything you’re buying yourself
3. Professional help and feesDesign or architectOften paid before construction starts
Structural engineerIf walls or loads are changing
Permits and inspection feesCheck who pays in your contract
Owner’s rep or consultantIf you’re using one; see what an owner’s rep costs
4. Living and logisticsDebris removal and dumpsterIf it’s an exclusion in your bid
Delivery and storageFurniture, appliances and materials
Temporary living costsTakeout, a temporary kitchen, hotel nights, pet boarding
Higher utility billsAngi lists power tools and water use as common extras
5. Contingency15% or 20%Applied to the total of blocks 1 to 4

How to fill in each block

A worksheet only helps if the numbers in it are real. Here’s how to find each one.

  1. Construction: Copy these lines from your contractor’s bid. If you have more than one bid, use the one you’re most likely to sign, and note where the others differ. Our guide to reading a construction bid shows how to line them up.
  2. Materials and selections: Start with the allowance amounts in the bid, then price what you’ve chosen. If your tile choice costs more than the tile allowance, the difference goes in your budget now, not in a surprise invoice later.
  3. Professional help and fees: Ask your designer, architect or engineer for their fee in writing. Your city or county building department lists permit fees, and your contract should say who pays them.
  4. Living and logistics: Estimate these by the week. Work out what a week of disruption costs your household, then multiply it by the weeks the work will take. Our guide to how long a home renovation takes can help with the timeline.
  5. Contingency: Add it last, as 15% or 20% of everything above it, so it grows with the project.

What this looks like on a real project

Here’s an illustrative example using the 2025 national average for a midrange major kitchen remodel. It isn’t a quote. It shows how the all-in number grows once every block is filled in.

LineAmount
Construction and materials (Cost vs. Value 2025 average)$82,793
Design, permits and fees (8%, inside Block’s 5% to 15% range)$6,623
Living and logistics (4%, inside Block’s 3% to 5% range)$3,312
Subtotal$92,728
Contingency (15%)$13,909
All-in budget$106,637

That’s about 29% more than the construction number alone. In an older home that calls for a 20% contingency, the same project lands at about $111,274. If your budget was built from the quote, this is the gap that turns into stress halfway through.

Once your worksheet is filled in, the next step is making sure your contract matches it. Our contract review checklist walks you through it line by line.

When the numbers don’t fit

If your worksheet total is higher than what you can spend, you have more options than cutting the contingency (please don’t cut the contingency).

  • Phase the project. Do the structural and systems work now and the finishes later, when it costs less to wait. Our budgeting guide covers separating the structural budget from the finish budget.
  • Re-scope your selections. Materials are the biggest single bucket, so this is where a few decisions move the total the most. Look at the cabinet line and the allowances first.
  • Ask your contractor where the savings are. A good contractor can often suggest a less expensive material, a simpler detail or a different order of work that keeps what matters to you. Ask the question directly, and get any changes written into the scope.
  • Reconsider the project itself. For some homes, the numbers point toward a different answer. Our comparison of new construction vs. a full renovation can help you think it through.

Before you commit, read up on the renovation mistakes that cost homeowners thousands. If you’re already underway and the numbers are slipping, here’s what to do if your contractor goes over budget.

A budget you can defend

A budget with every line filled in is one you can stand behind in every conversation that follows: with your contractor, your lender and yourself at 11 p.m. when a change order lands in your inbox.

If you’d like help building yours, our Project Planning support starts at $150 per hour and includes materials guidance and average pricing ranges, so it’s built for this stage. You can see the details on our owner’s rep and consulting services page, or start with a free discovery call.

Frequently asked questions

How much should I budget for a kitchen remodel?

Remodeling’s 2025 Cost vs. Value report puts the national average at $28,458 for a minor midrange kitchen remodel and $82,793 for a major midrange one. The 2026 Houzz & Home Study found median spending of $35,000 to $55,000 for major kitchen remodels, depending on kitchen size. Your bids set the real number for your home.

How much contingency should a renovation have?

Our rule is 15% of the total project cost. Make it 20% for an older home or any project that opens up walls, floors or plumbing.

What costs are often left out of a contractor’s quote?

Design and permit fees, living costs during construction and anything listed as an exclusion in the bid. Debris removal, storage and temporary housing are common examples.

Should my budget include an owner’s rep or consultant?

If you plan to use one, yes. Give it its own line in the professional help block so it’s planned for from the start. Our guide to what an owner’s rep costs shows typical fees for bathrooms, kitchens and additions.